Building the shed - Part 2: Fixing the floor to the foundations

Videos: 

Today we fixed the floor to the foundations.
Materials used:

  • 4 x 3000x75x50mm H4 treated timber lengths
  • 18 or 19 x H3 treated timber floorboards
  • 4x40cm and 4x60cm galvanized metal bracing straps ( for strapping runners to timber foundation piles )
  • 4x corner bracing units. ( optional extra )
  • 3.15mm galvanized bracket nails ( for nailing bracing straps to piles )